Saltar al contenido
Velora Lighting · Centro B2B global | Exportación directa de fábrica desde Foshan, China
Español
OEM guide

OEM Stage Lighting from China: MOQ, Lead Time and Quality Checklist

Velora Lighting ·

OEM Stage Lighting from China: MOQ, Lead Time and Quality Checklist

Planning a private-label stage lighting brand? Learn typical MOQs, lead times, branding options and the QC checks to require from your factory.

Private-label lighting lets distributors build margin and brand loyalty. Here is what a typical OEM project with a Chinese factory looks like.

Typical MOQ

Logo printing often starts around 20 units per model; custom housings or firmware need larger runs. Mixed-model containers help reach MOQs.

Lead time

Plan 15–30 days for production after artwork approval, plus shipping time.

Quality checklist

  • 72-hour burn-in test records
  • Photos/videos of each production stage
  • Spare parts kit (boards, motors, lamps)
  • CE/RoHS documents matching your model numbers

Ready to start? See our OEM / ODM program.

¿Necesita una cotización?

Envíenos sus requisitos y obtenga precios de fábrica.

¿Pedido al por mayor u OEM? Obtenga precios de fábrica en minutos. Pedir cotización